Wastewater
Wastewater Disposal
Sewer System and Treatment Plant
Operation and Maintenance of Sewer Collection System and Treatment Plant
- Sewer collection mains and laterals in central area and golf area
- Several lift stations along the lines
- Treatment plant in central area (Phase 2 still to be constructed)
- 4 lined irrigation ponds
- Delivery systems/pumps to and between irrigation ponds
Monitoring, Reporting and Condition Compliance for Wastewater Treatment
Acceptance of Sewer Connections
Septic Systems for All Other Lots
- Inspection and Routine Maintenance of Septic Systems (repairs/replacement excluded)
- Installation of Remaining Septic Systems 5 years after each phase (no expense to CSD)