Wastewater

Wastewater Disposal

Sewer System and Treatment Plant

Operation and Maintenance of Sewer Collection System and Treatment Plant

  • Sewer collection mains and laterals in central area and golf area
  • Several lift stations along the lines
  • Treatment plant in central area (Phase 2 still to be constructed)
  • 4 lined irrigation ponds
  • Delivery systems/pumps to and between irrigation ponds

Monitoring, Reporting and Condition Compliance for Wastewater Treatment
Acceptance of Sewer Connections

Septic Systems for All Other Lots

  • Inspection and Routine Maintenance of Septic Systems (repairs/replacement excluded)
  • Installation of Remaining Septic Systems 5 years after each phase (no expense to CSD)